Yugses-50 MW2019-05-14T04:44:48+00:00

Project Description

YUGSES-50 MW

Project details

DATE
March, 2019
CUSTOMER
Risen Energy Hongkong Branch Kazkhstan
TYPE OF PROJECT
Photovoltaic power plant
CONTRACTOR
ADK Solar LLP

WORK DESCRIPTION

  • Our team conducted the Ramming and pull out test Studies for the construction of a photovoltaic solar plant with installed capacity 50 MW.
  • The team was lead by CEO of ADK Solar Mr. Arman Mombekov. Risen Energy was represented by Mr. Timothy Mao.
  • The inspected area is 125 ha.
  • The tests were executed at 50 different points inside the construction territory. At each point, 2 H shaped (with dimensions 150X100X6X5 and 200X100X6X5) piles were driven to the depth of 2 m.  1 pile for pull out test, another is for the lateral load test.
  • The maximum load applied for the pull out test is 20 kN.
  • The maximum load applied for the lateral load is 4,5 kN.
  • It is planned to connect the PV plant into the national grid via Sholakkorghan substation which is operated by the system operator JSC KEGOC.