Project Description
Project details
DATE March, 2019
CUSTOMER Risen Energy Hongkong Branch Kazkhstan
TYPE OF PROJECT Photovoltaic power plant
CONTRACTOR ADK Solar LLP
WORK DESCRIPTION
- Our team conducted the Ramming and pull out test Studies for the construction of a photovoltaic solar plant with installed capacity 50 MW.
- The team was lead by CEO of ADK Solar Mr. Arman Mombekov. Risen Energy was represented by Mr. Timothy Mao.
- The inspected area is 125 ha.
- The tests were executed at 50 different points inside the construction territory. At each point, 2 H shaped (with dimensions 150X100X6X5 and 200X100X6X5) piles were driven to the depth of 2 m. 1 pile for pull out test, another is for the lateral load test.
- The maximum load applied for the pull out test is 20 kN.
- The maximum load applied for the lateral load is 4,5 kN.
- It is planned to connect the PV plant into the national grid via Sholakkorghan substation which is operated by the system operator JSC KEGOC.